Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Last revision Both sides next revision
en:v2:core:ugd:ugd_about [2022/02/24 17:10]
locko_t [About ASTER]
en:v2:core:ugd:ugd_about [2022/04/10 15:14]
maria_k [About ASTER]
Line 18: Line 18:
 Depending on the capacity of the computer and the work that will be done, several workplaces can be created (maximum 12). However, systems with a large number of workplaces (6 or more) must be tested beforehand with the set of software and hardware that you plan to use.\\ Depending on the capacity of the computer and the work that will be done, several workplaces can be created (maximum 12). However, systems with a large number of workplaces (6 or more) must be tested beforehand with the set of software and hardware that you plan to use.\\
 </​WRAP>​\\ </​WRAP>​\\
-Testing is necessary in order to find an unforeseen error in the operation of your software and the compatibility of hardware. For this, there is a trial period (30 days)(See. [[.:​ugd_licensing#​ugd_licensing_trial|Trial Period]] ) of ASTER which you can try out and decide whether to purchase an ASTER license or not.+Testing is necessary in order to find an unforeseen error in the operation of your software and the compatibility of hardware. For this, there is a trial period (14 days)(See. [[.:​ugd_licensing#​ugd_licensing_trial|Trial Period]] ) of ASTER which you can try out and decide whether to purchase an ASTER license or not.
  
 The history of version changes is available [[..:​history|here]]. The history of version changes is available [[..:​history|here]].